Water Lines: A Life on Marshes, Rivers, Seas and in the Rain (Hardcover) BK945 000 ALL
Couldn't load pickup availability
A luminous, deeply felt collection of essays from Riverhorse Nakadate—angler, musician, conservationist, and lifelong nomad—whose devotion to wild places and the healing power of water pulses through every page. For readers of Edward Abbey, Barry Lopez, Mary Oliver, and Jim Harrison, this book is a soulful invitation to step off the grid and into the current.
Across 32 essays, Nakadate paddles, hikes, casts, surfs, and canoes through landscapes as varied as the alpine lakes of Colorado, the salt marshes of his native Texas, the trout streams of Minnesota, and the mangrove swamps of the Yucatán. Whether he’s chasing redfish in a hurricane, rescuing baby squirrels or migrating monarch butterflies, or honouring his mother’s legacy with a canoe ride and a slice of sweet-potato pie, Nakadate writes with poetic precision and a fierce, tender reverence for the natural world and his fellow human travelers.
At the heart of the book is a love for water in all its forms—river, rain, surf, snowmelt—and a belief that wilderness is not a luxury, but a necessity. Nakadate’s prose is rich with sensory detail and emotional depth, blending humor, heartbreak, and philosophical insight. He reflects on solitude, friendship, loss, and the quiet heroism of those who, like him, strive to protect our wild spaces. His encounters with wildlife, fellow anglers, and strangers on the road become meditations on connection, resilience, and the redemptive gifts of wanderlust.
Environmental themes run deep: from the threatened Boundary Waters to the shark-finning crisis in the Gulf, Nakadate bears witness to the fragility of ecosystems and the urgency of conservation. Yet his tone remains hopeful, grounded in the belief that small victories—one fish released, one river defended—can ripple outward.
Water Lines is not just about fishing or travel; it’s a celebration of living deliberately, loving fiercely, and listening deeply to the rhythms of the earth. For anyone who’s ever felt the tug of a river, the pull of a distant horizon, or the quiet joy of a campfire under the stars, this book will feel like coming home.
About the Author
Riverhorse Nakadate is a Patagonia fly-fishing ambassador, adventurer, environmentalist, and musician whose writing can be found in numerous surfing, guitar, and fly-fishing magazines. He has starred in three films: Love & Water, A Northern Light, and The Reindeer Journals. The recipient of the first-ever Texas Backcountry Hunters & Anglers Leadership in Public Land and Water Conservation Award, he resides in a 1910 bungalow in a historic district of Houston.
About the Illustrator
Sarah Lamar Stephens is an artist and apparel designer based in Seattle. Being outside and fostering community gives her energy to create.
From Kirkus Reviews
"Reading these essays is a bit like sitting around a campfire by a lake at night, listening to Nakadate muse about his numerous adventures, large and small. ...A natural-born storyteller, Nakadate can turn on a dime from amusing and wry to pithy and aphoristic, then wind up charming and sweet. ...A delicious collection to be savoured individually or as a whole."—Kirkus Reviews
Locations Featured in Water Lines
- Texas waterways, rivers, and lakes, Gulf of Mexico
- Colorado
- Oregon coast
- California
- Minnesota -- Boundary Waters
- Yucatan
- Montana
Specifications
256-page hardcover book printed in full colour with over watercolour illustrations throughout; 5.5 inches by 8.5 inches
Publisher
Published by Patagonia
Features
32 essays; over 20 original watercolour illustrations
Country of Origin
Made in Canada.